TAYLOR, Mich. - Downriver communities are no stranger to seeing trains blocking their roads, but it’s happening in Taylor at Beech Daly Road for hours at a time, leaving traffic backed up and drivers looking for detours.
For Brenda Lavely, it’s not a new problem — but it’s getting old. Lavely has lived on Beech Daly Road in Taylor for 65 years.
She says a train stopping on the nearby railroad tracks for hours at a time has become an all-too-familiar disruption, periodically stranding residents, blocking driveways and bringing traffic on the busy road to a complete standstill.
“You can’t get to your home. I waited 45 minutes one night to come home, and I had to actually break the law to drive on the wrong side of the street to get home. You shouldn’t have to do that,” Lavely said.
A traffic nightmare with nowhere to go
Lavely says semi-trucks and cars back up all the way to Ecorse Road, creating a gridlock that compounds on itself.
All the semi-trucks and cars back up to Ecorse Road and then the trucks can’t turn left off of Ecorse onto Beech because they’re already backed up. So that holds up the left turn lane. And then they can’t turn right onto Beech Daly because the trucks have nowhere to go,” Lavely said.
There’s no truck traffic on nearby Wick Road, leaving heavy vehicles with no alternative route.
The backup blocks homeowners from accessing their driveways and cuts off the entrance to a nearby mobile home park.
Eric Ison, who lives off Beech Daly Road, said residents of the mobile home park are regularly stuck waiting for a gap in traffic.
It’s a common occurrence. A lot of times though, we’ll be stuck here for you know, quite a bit of time until somebody is able to clear a spot for us to go through because everyone wants to compress together,” Ison said.
Lavely said another train was stopped on the tracks when she left for work at 7:30 a.m. Wednesday and was there through the late afternoon.
Railroad companies point fingers at each other
When Lavely’s family tried to reach Canadian Pacific Kansas City, which runs trains over the route, and Norfolk Southern, which operates the railroad, she says they were bounced back and forth with no resolution.
“My daughter called the train company, and they blame the rail company, the rails. When you call the rail company, they blame the train company. So it’s just back and forth. Nobody takes responsibility for what’s going on,” Lavely said.
.
“The railroad tracks you are referencing along Beech Daly Road are Norfolk Southern tracks,” the company said in a statement. “CPKC does not control the movement of the trains in that location and corridor.”
Norfolk Southern provided the following statement on Nov. 19:
“Norfolk Southern was aware of the stopped train near Beech Daly and Ecorse roads in Taylor. A temporary increase in train traffic at Oakwood Yard resulted in some trains being held outside the yard until traffic ahead cleared.
Our teams worked to safely move trains through the area and minimize impacts to nearby crossings.
We recognize the inconvenience stopped trains can cause for residents and motorists, and we apologize for the disruption. We appreciate the community’s patience while our teams worked to safely move trains through the area while minimizing impacts to nearby crossings.
This was an isolated situation, and we do not expect it to be a recurring issue.
Residents can report issues at an NS crossing to NS Police at 800-946-4744. Motorists and pedestrians should never attempt to cross through, under, or around a stopped train."
City of Taylor weighs in
The City of Taylor says it has been trying to address the problem for months but has repeatedly run into the same wall — federal jurisdiction over railroad operations.
“Over the past months, we have tried, without success, to mitigate this issue. The federal government essentially controls the railways, not local authorities. But hours-long delays along any road in our community are unacceptable, and we will continue to work to eliminate these types of issues as best we can,” the city said in a statement.
Lavely said she just wants a solution.
“If they’re going to be there a long period of time, they should have to uncouple the train and make an opening so people can go ترجمةthrough. But they don’t do anything,” Lavely said.



