The Ministry of Public Works and Transport and the Civil Aviation Authority announced in a joint statement the launch of technical calibration operations and operational testing of air navigation systems and visual aids at Qlayaat Airport (President René Moawad Airport) on November 22.

The statement said the procedures include thorough checks of the efficiency of the Precision Approach Path Indicator (PAPI) system, approach and landing procedures, and air traffic management in the airspace surrounding the airport.

As previously announced, a series of additional flight inspection tests are scheduled to take place once the runway rehabilitation works have been completed and all technical readiness requirements and operational safety standards have been met.

The ministry and the authority stressed that the project to rehabilitate and reopen Qlayaat Airport has moved from the planning stage into actual implementation and comprehensive engineering work on the ground, in accordance with a carefully planned timetable designed to ensure the sustainability of the airport's navigation infrastructure.

They also emphasized that this vital strategic facility is subject, at every stage, to the regulations and standards issued by the International Civil Aviation Organization (ICAO), particularly Annex 14, which governs airport design and operations.

They further stressed that aviation security and operational safety remain the highest priority and are non-negotiable, adding that there will be no compromise on these standards under any circumstances.